Bhaskar Steel & Ferro Alloys to expand its steel in Badtumkela in Sundergarh district of Orissa with an investment of Rs. 118.5 million. The project involves setting up of Induction Furnace (1x8.0 MT) in the existing Steel Plant. DRI Plant, Induction furnace (IF), Steel melt shop (SMS) and captive power plant (WHRB and AFBC) already exists and another IF is proposed due to break down and maintenance of the existing furnace. IF will be installed in the existing premises and no additional land will be required. The new unit will manufacture the following products
S.N. |
Unit |
Existing |
Proposed |
After expansion |
1 |
DRI |
1x300 TPD |
-- |
1x300 TPD |
2 |
SMS |
|||
a |
Induction furnace |
24 T (8 Tx3) |
8T (8 T x 1) (Standby furnace) |
24 T (8 Tx3) 8T (8 Tx1) (Standby furnace) |
b |
Ladle Refining furnace |
1x20 T; 1x15 T |
-- |
1x20 T; 1x15 T |
c |
Continuous Billet Caster |
72,000 TPA |
-- |
72,000 TPA |
3 |
Power Plant WHRB AFBC |
12 MW (8 MW) (4 MW) |
-- |
12 MW (8 MW) (4 MW) |
Ghodganga Sahakari Sakhar Karkhana to set up distillery at at Rao Saheb Nagar in Nhavare in Shirur in Pune district in Maharashtra with an investment of Rs. 99.5 million. The project involves setting up of 30 KLPD Molasses based distillery unit for production of 30 KLPD of Rectified Spirit or 27 KLPD of Extra Neutral Alcohol or of 27.5 KLPD Absolute Alcohol. The unit was established in 1990 having sugar unit of 2,500 TCD crushing capacity. Now, the company have proposed to establish distillery unit within the same premises adopting continuous fermentation process.
Tata Chemicals to set up a distillery at Kusnoor in Nanded district of Maharashtra with an investment of Rs. 1200 million. The project involves setting up of 130 KLPD Fuel Ethanol Plant and 7 MW Captive Co-generation Plant. . Two boilers (FBC type) of 45 Tonne/hr. and 20 Tonne/hr capacity will be installed. The fuel required for Boiler will be Baggase and HSD for D.G. set. The spent wash generation will be @ 3.0 lit/lit of total spirit produced. Spent wash treatment will be by concentration in the Multi-effect evaporator followed by Bio-composting with pressmud. The pressmud requirement of 125 to 130 TPD will be met from the plant itself and nearby sugar industries.
Nira-Bhima Sahakari Sakhar Karkhana to set up a distillery at Shahajinagar in Pune district in Maharashtra with an investment of Rs. 275.2 million. The project involves setting up of molasses based 30 KLPD distillery which is attached to sugar unit of 2500 tcd capacity. The distillery will operate for 270 days in a year.
11,950 ₹ | 4950 ₹ | 4950 ₹ | 4950 ₹ | 3950 ₹ |
Copyright © 2013 Ibis Research Information Services Pvt Ltd. All Rights Reserved.
Contact : Ibis Research Information Services Pvt Ltd., 28, Rajaji Street, NGO Colony
Guduvancherry, Chennai -603 202 Mobile : 0-97898-37940 email : [email protected] Privacy Policy