Bhaskar Steel & Ferro Alloys to expand its steel in Badtumkela in Sundergarh district of Orissa with an investment of Rs. 118.5 million. The project involves setting up of Induction Furnace (1x8.0 MT) in the existing Steel Plant. DRI Plant, Induction furnace (IF), Steel melt shop (SMS) and captive power plant (WHRB and AFBC) already exists and another IF is proposed due to break down and maintenance of the existing furnace. IF will be installed in the existing premises and no additional land will be required. The new unit will manufacture the following products
S.N. |
Unit |
Existing |
Proposed |
After expansion |
1 |
DRI |
1x300 TPD |
-- |
1x300 TPD |
2 |
SMS |
|||
a |
Induction furnace |
24 T (8 Tx3) |
8T (8 T x 1) (Standby furnace) |
24 T (8 Tx3) 8T (8 Tx1) (Standby furnace) |
b |
Ladle Refining furnace |
1x20 T; 1x15 T |
-- |
1x20 T; 1x15 T |
c |
Continuous Billet Caster |
72,000 TPA |
-- |
72,000 TPA |
3 |
Power Plant WHRB AFBC |
12 MW (8 MW) (4 MW) |
-- |
12 MW (8 MW) (4 MW) |
11,950 ₹ | 4950 ₹ | 4950 ₹ | 4950 ₹ | 3950 ₹ |
Copyright © 2013 Ibis Research Information Services Pvt Ltd. All Rights Reserved.
Contact : Ibis Research Information Services Pvt Ltd., 28, Rajaji Street, NGO Colony
Guduvancherry, Chennai -603 202 Mobile : 0-97898-37940 email : [email protected] Privacy Policy